Turnkey Brake Pad Factory

All Machinery You Need & Process Know-How

Building a brake pad manufacturing plant? Walden Mechatronics delivers an end-to-end turnkey line: layout planning, engineering, automation, commissioning, and training — designed for repeatable quality and scalable output.

Scroll to see the full production line details ↓

Turnkey brake pad factory setup - fully automated press line

Turnkey Scope (What You Get)

A factory-specific, end-to-end solution — from concept to SAT and operator training.

  • Facility & line planning: production flow, layout, and infrastructure needs (electrical / pneumatic / hydraulic).
  • Engineering & automation: modular line architecture, safety, PLC/HMI, recipe-based parameters.
  • Process know-how: pressure/temperature/time optimization, venting cycles, fast changeovers.
  • Commissioning: integration, test production (SAT), and training for stable, reproducible quality.
Warm press line concept for brake pad manufacturing

Production Line Modules

Key machines and stations delivered as modular building blocks (scalable, capacity-driven).

Fully Automatic Press Systems (330 Ton PC/LCV • 500 Ton CV)

Warm press technology engineered for speed and repeatability — up to 5× faster than conventional hot pressing (process-dependent).

  • 330 Ton for Passenger Car / LCV lines.
  • 500 Ton for Commercial Vehicles (CV) and large-surface pads.
  • 2-cavity & 4-cavity tooling options (product-dependent).
  • Down to 39-second cycle time on 330-ton warm presses with 2-cavity tooling in high-volume production.
Feature 330-Ton Fully Automatic Press 500-Ton Fully Automatic Press
Recommended Segment Passenger Car / LCV Commercial Vehicles (CV), large pads
Typical Tooling 1–2–4 cavity (product-dependent) 1–2 cavity (often due to larger pad size)
Output Focus High-volume, fast changeovers High force for larger surface area
Cycle Time (example) Down to 39s with 2-cavity tooling* Process-dependent
Automation Recipe-based parameters, full press station automation, conveyor integration
*Cycle time depends on pad type, formulation and process parameters.
Fully automatic press systems for brake pad production lines

High-Precision Filling & Dosing + Underlayer Integration

Underlayer and friction material can be applied sequentially on the same dosing system — simpler line design and cleaner changeovers.

  • Eliminates the need for a separate underlayer machine.
  • Reduces material losses during recipe changeovers.
  • Improves underlayer thickness uniformity.
  • Up to 25% original mix / chemical savings with the Underlayer System.
High-precision dosing and filling with underlayer integration

Dust Collection & Recovery Technology

Vacuum-based recovery minimizes waste: dust from filling and grinding can be filtered and returned back to the mix tank.

  • Collects dust generated during filling and grinding operations.
  • Filters and makes it reusable (return to mixing tank).
  • Reduces waste-related costs and improves raw material utilization.
Dust collection and recovery technology for friction material production

Auxiliary Equipment & Full Line Integration

From press output to downstream steps — integrated stations for uninterrupted flow and standardized quality.

  • Press station functions: cleaning, dosing/filling, backplate loading, discharge, conveyor integration.
  • Pre-grinding integration for faster and more precise preparation.
  • Painting booth + drying ovens can be integrated to reduce labor and standardize finish quality.
  • Advanced positive-forming deep molds support correct material flow under demanding conditions.
Auxiliary equipment and full line integration for brake pad factories

Plug & Play Logistics • Fast Startup

Container-friendly designs for sea/rail transport. Equipment can be shipped pre-assembled and pre-tested to simplify installation and shorten start-up time.

  • Plug & Play: pre-assembled, pre-tested shipping concept.
  • Short delivery time: production startup can be achieved within 6–9 months depending on order date.
Plug and play logistics for turnkey factory setup

Key Highlights

Quick facts that matter for investors and project planning.

32+ YearsEngineering Experience
39s Cycle TimePrimary (First) Pressing*
Up to 25% SavingUnderlayer / Original Mix*
Dust RecoveryVacuum Filtration to Mix Tank*
*Performance figures depend on product type, formulation, tooling and process parameters.

Request a Turnkey Line Concept

Share your product focus (PC/LCV or CV), target capacity, and available space — we’ll propose the right modular line configuration.

Walden Mechatronics
İzmir / Türkiye
Phone: +90 232 700 25 03  |  Fax: +90 232 999 16 26
Website: www.waldenmekatronik.com
Email: info@waldenmekatronik.com